Peljesac Bridge and Connection Project, Croatia
Project Overview
The Peljesac Bridge and Connection Line Project in Croatia is located in the southern end of Croatia. It connects the mainland and the Peljesac Peninsula, totaling 3940m. The bridge is 2440m long, and the connecting lines are 1500m long at both ends. This project was awarded by the consortium led by China Road and Bridge, and the CCCC Second Public Bureau is responsible for its specific implementation. The primary source of funding is the European Union Fund.
Project Planning
The project camp covers an area of 15,200m2, and the main building area covers three major aspects: office, living, and production. It includes an office area, a living area, a basketball court, an activity room, etc. With its scientific layout and complete functions, it not only ensures the work needs but also enriches the workers' spare time lives.
Project Products
Tseason flat pack modular homes are used to build this project, and the advantages of the products are as follows
- Top and bottom frames:2.3-3mm integral molding Top and bottom frames
- Integrated materials top and bottom frames on-site installation of cement board 30kg/m³ fiberglass blanket
- 2.5mm Load-bearing corner column
- 3-5 floors Load-bearing capacity
- 0.3mm 50mm 50kg/m³ Rock Wool Wall Panel
- Medium Insulation perform
- Cost-effective brands of raw material grade
- $1150-1750/SET